Glenview Fence Installation
Fenceworks is Chicagolands premier fence contractor licensed & bonded and has been safeguarding properties since 1967.
At Fenceworks we understand the importance of giving your backyard a personalized touch with a new fence. We take pride in offering a vast range of fencing materials that can be customized to your preference and taste.
Fenceworks installs a variety of different types of fences in Glenview. Customers can choose to buy a fences made out of cedar, PVC / vinyl, aluminum, composite, and chain-link. At Fenceworks we have the right fence for your business or your home.
Useful information about Glenview Installation
Glenview Village Hall Phone Number |
847-724-1700 |
Glenview Village Hall Hours |
Monday – 8:30 a.m. to 4:30 p.m. Tuesday – 8:30 a.m. to 4:30 p.m. Wednesday – 8:30 a.m. to 4:30 p.m. Thursday– 8:30 a.m. to 4:30 p.m. Friday – 8:30 a.m. to 4:30 p.m. |
Glenview Website |
|
Glenview Fence Installation Permit Links |
|
How long will it take for me to get my permit? |
7-10 business days |
Glenview Fence Installation Permit Process
A freestanding barrier device constructed of metal, masonry, composition or wood, or any combination thereof, and designed for exclusion, confinement or screening, provided such device shall not be electrically charged and, except with respect to restricted areas of public utilities and potentially dangerous installations or enclosures protecting livestock, barbed wire shall not be used in or adjacent to any residential district. A fence is subject to maximum height, material, and design requirements (as listed in the Municipal Code at the following URL: https://library.municode.com/il/glenview/codes/code_of_ordinances?nodeId=MUCO_CH98ZO_ARTIVACUSHOOC_S98-213SAPEEX). Fences must be installed completely upon your private property and the finished side of the fence must face outward (toward the street and/or neighboring properties). Existing drainage patters cannot be obstructed by fencing. Replacement of less than 50% of the linear footage of an existing fence within any 2 year period with matching fencing does not require a building permit. A plat of survey which depicts the current conditions upon the property and depicting the proposed location of existing fencing and the proposed fence. Upon determination that the application submittal is complete and after the Plan Review is complete and approved, a Permit Fee payment will be required for Permit Issuance. Permit Issuance provides permission to begin construction. A final inspection is required upon completion of the work.